Idoka – Iren,
30 MW greenfield execution design

 

2022

Project: 30 MW execution design of two greenfield PV plants located in Basilicata.

Client: Idoka Costruzioni, EPC contractor specialized in solar and wind EPC projects. Final client Iren S.p.A.

Activities: SunGAP is supporting the Client in identifying the best technical solution in order to built the two plants with a total capacity of 30 MW complying with authority and final Client requirements, maximizing revenue and reducing construction time.